Set in Melbourne’s coastal canal suburb of Patterson Lakes, this residential slab project called for a solid foundation on a site known for its sandy soil conditions and water-adjacent positioning. Bay 2 Bay was engaged to complete both the site preparation and slab pour for a new high-spec home.
With the site located just metres from a connected lake system, soil conditions presented immediate complexity. The sandy substrate typical of the area lacks natural compaction, making it more susceptible to movement and uneven settlement over time. Add to that the site’s premium residential setting, where client expectations are high and execution must be clean, and this became a project where precision, care, and control were non-negotiable.
The challenge: delivering a structurally sound slab on unstable ground without compromising finish or program.
Bay 2 Bay’s team approached the project with a strong focus on base preparation and ground stability. Using tested compaction methods and careful site levelling, they created a clean, well-prepped foundation to support the slab. Reinforcement placement and formwork were executed with care, ensuring the slab could perform under long-term structural loads. Working closely with site stakeholders, the team maintained clear communication and resolved minor design adjustments on the fly—keeping progress on track and quality uncompromised.
The solution: focus on ground prep, smart reinforcement, and clear coordination to keep the project moving forward with confidence.
The finished slab was delivered to spec, on schedule, and with a clean, high-quality finish that set the standard for the rest of the build. This project demonstrated Bay 2 Bay’s ability to manage environmentally sensitive conditions while maintaining their reputation for reliable, professional concreting.
The result: a clean, compliant slab that gave the builder a stable foundation and peace of mind.