Bay 2 Bay Concreting was engaged to complete the site mark-out and installation of screw piles for a new residential development in Balaclava. Located in one of Melbourne’s most densely populated inner suburbs, this project called for a highly coordinated approach to deep foundation work, where precision, access management, and structural reliability were non-negotiable.
Like many inner-Melbourne suburbs, Balaclava presents unique logistical and structural challenges. This site was compact, hemmed in by neighbouring properties, with no rear access and limited room for staging or machinery. Excavation-based foundations like bored piers or strip footings would have introduced major disruption, longer timelines, and higher removal costs. Compounding the issue, the soil conditions were variable, common in older, redeveloped urban blocks—meaning ground stability and footing performance could not be left to chance.
The challenge: achieving fast, stable foundations in tight-access conditions where traditional footings weren’t practical or efficient.
Bay 2 Bay delivered a full-scope screw pile installation, starting with a precise site mark-out based on engineering specs, ensuring pile locations aligned perfectly with the building’s structural design. The team used compact, low-vibration equipment specifically suited for confined urban sites, allowing for efficient pile driving without the noise, spoil, or disruption of traditional excavation methods.
Screw piles were selected not just for access reasons, but because they offer immediate load-bearing capacity with minimal ground disturbance - ideal for variable soil conditions and builds with tight construction timelines. The piles were installed to engineered torque specifications, guaranteeing performance without the need for curing or downtime. Throughout the process, the team coordinated closely with the site supervisor and surrounding trades to keep workflow smooth and the site safe.
The solution: engineered screw piles installed cleanly and efficiently, offering a stable, ready-to-build foundation without the complexity of traditional footings.
The screw pile installation was completed with zero rework and passed inspection on the first attempt. The builder was able to proceed directly to framing on a reliable foundation system, saving time, reducing excavation, and avoiding wet weather delays often associated with traditional footing systems. This project highlighted Bay 2 Bay’s specialist capability in screw pile supply and installation, and their ability to bring practical, engineer-approved solutions to complex residential builds.
The result: a clean, certified screw pile install that delivered time and cost efficiency in a tight urban setting.